« Back To Robotics Case Studies
Lanco Integrated Logo

Member Since 2017

LEARN MORE

Lanco Integrated is one of the world's most experienced designer and manufacturer of turnkey automated assembly and test systems. From concept to design through manufacturing and after sales service, no one covers the globe with more reliable or innovative products and services. With locations in North America, Germany and Asia, Lanco Integrated specializes in creating modular powered and free and CAM driven assembly systems designed to meet our customers current and growing needs. Operating primarily in the automotive, medical device, electronics, consumer products and telecommunications industries, Lanco is often a sought after partner for its unique ability to support its customers from prototyping through machine delivery and beyond. Lanco Integrated Empowers Global Assembly.

Content Filed Under:

Industry:
Aerospace and Automotive Aerospace , Automotive , Consumer Goods/Appliances , Medical Devices , Metals , Military/Defense , and Pharmaceutical

Application:
Assembly , Dispensing , and Material Handling Assembly , Dispensing , Material Handling , Material Handling , and Other

See More

CAM Driven - Diagnostic Test Kit Assembly

POSTED 09/28/2020

Winterbach, Germany

CAM Driven - Diagnostic Test Kit Assembly

Client

A manufacturing leader and distributor within the medical device, consumable and instrumentation industries.

Application

Lanco Integrated delivered an assembly machine with high volume part output for capped vials with different diameters and lengths. The solution integrated a fully mechanical driven base machine with automated part feeding. Capacity of the machine calculates by a 4-track design, 35 cycles in a minute with up to 140 parts/min. The assembly is performed by screwing vials and caps. The torque of the screw operation is monitored and adjusted according to the related variant. Additionally, the machine will dose a precise amount of liquid into the vials before closing. The machine is as well equipped to ensure precise, guaranteed calculation at the offload station.

Challenge

Lanco Integrated was challenged to deliver a proprietary machine, that under normal working conditions, would take 28 weeks to build with full staff. We were tasked with the challenge to complete the project in 15 weeks with a reduced workforce. Lanco was up for the challenge. The assembled product is used in diagnostic testing for the Corona Virus. Availability of sample parts was problematic, as it limited the testing and set up times throughout the build.


Don't Miss These Industry-Leading Events!

IRSC

October 1-3, 2024
Cincinnati, OH

HRF

October 7, 2024
Memphis, TN

AMRL

October 8-10, 2024
Memphis, TN

AISA

November 12-13, 2024
Atlanta, GA


 

Lanco Integrated Solution

Lanco Integrated understood the customer’s needs and developed a streamlined program for maximum efficiency to meet a hard target deadline. The design team worked around the clock during the Pandemic to develop a multi shift operation schedule for the assembly. This multi shift concept enabled Lanco to maintain continuous construction while limiting risk to their staff by setting control groups. Another variable Lanco encountered was working in concert with their parts suppliers to ensure they could meet strict deadlines to avoid any disruption to the build schedule.

Outcome

Lanco was successful in not only meeting their customers expedited deadline, but also in adhering to strict quality control guidelines within the medical device industry. The machine was tested onsite with the customer and passed the acceptance test. This was a special win for Lanco to know that their machine would be beneficial to combating the Corona Virus.